Stanton, CA · Serving the South Coast Air Basin
Doc · AE-Web · Iss 04/2026 · Rev 12
Mon–Fri 07:00–18:00 PT · Crews Deployed

SCAQMD LAP · CARB Certified

Source testing for the South Coast, since 1998.

Certified field specialists with deep method knowledge, LAP-approved procedures, and District-ready deliverables. Dispatched from Stanton — on your stack when you need us.

Dispatch live
Accepting Q2 2026 jobs · Quote in 24-48 hours · Mobilization immediate upon agreement
120+
Methods
99.99%
First-pass
6,400+
Tests
35+
Yrs experience
Fig. 01 · Stack crew, refinery heater · Torrance, CA
South Coast Air Basin · N 33°47'
§ 02.00

What we do.

We handle the full source testing process — from permit review to protocol development, field testing, and final report. All work is performed in-house by our certified team, and every deliverable is formatted for District acceptance.

Routine Seasonal On Request
Capability
Scope
Governing rules / methods
Jurisdiction
01
Source Testing Criteria Pollutants
We read your permit, determine what testing is required, and write a protocol tailored to your equipment and operating conditions. Once the District approves the protocol, we schedule and conduct the test — measuring NOx, CO, O₂, and CO₂ at the stack. Reports delivered within 30 days of testing.
SCAQMD 1.1–4.1 SCAQMD 5.1–5.3 SCAQMD 6.1 SCAQMD 25.1 · 25.3 SCAQMD 100.1 SCAQMD 207.1
SCAQMD · CARB · VCAPCD · SDAPCD
02
SCAQMD Compliance Testing District Rule-Driven
Rule 1146 / 1147 and permit-specific requirements. We review your permit, map the applicable rule to a test protocol, coordinate approval with SCAQMD engineering staff, conduct the test according to the approved protocol, and deliver a completed source test report within 30 days.
Rule 1146 Rule 1146.1 Rule 1147 RECLAIM
SCAQMD only
03
CEMS & RATA Testing Monitoring System Audits
Monitoring system audits and certification under Rules 218.2 / 218.3. RATAs, Cylinder Gas Audits, 7-day drift, bias tests, and full Part 60/75 QA.
Rule 218.2 Rule 218.3 40 CFR 60 App F 40 CFR 75 PS-2 · PS-4A
SCAQMD · EPA Part 75
04
Air Toxics Testing AB 2588 Hot Spots
Formaldehyde, dioxins, metals, PAHs, benzene — AB 2588 compliance. Full Hot Spots inventory support, risk-assessment-grade data, and District reporting.
AB 2588 CARB 421 CARB 425 CARB 428 CARB 429 CARB 430 CARB 436 CARB 410A · 410B CARB 101A CARB 12
SCAQMD · CARB
Methods on file
120+
EPA · CARB · SCAQMD
First-pass acceptance
99.99%
5-yr avg
Mobilization
Uponagreement
from Stanton
Tests logged
6,400+
Since 1998
Field crews
4active
ISO-certified leads
§ 03.00

Where we work.

From Stanton, we serve permitted facilities under every major air quality district — primarily SCAQMD, VCAPCD, SBCAPCO, MDAQMD, and SDAPCD. We work throughout California and travel wherever our clients’ facilities require us.

Jurisdictions we test under

SCAQMDLos Angeles, Orange, Riverside, San Bernardino (non-desert)
CARBStatewide — Title 17 & AB 2588
VCAPCDVentura County APCD
SBCAPCOSanta Barbara County APCO
MDAQMDMojave Desert AQMD
SDAPCDSan Diego Air Pollution Control District
EPA Region 9Federal Part 60 / 75 matters

Trusted by

Southern California's industrial operators, since 1998.

Marathon Petroleum
Anheuser-Busch
California Boiler
Capstone Turbine
LAX Central Utilities
Georgia-Pacific
ExxonMobil
PBF — Torrance Refining Co.
§ 04.00

Questions we get,
by phone, mostly.

If yours isn't here, call dispatch. Wally Moe picks up.

Typical SCAQMD protocol review runs 10–20 business days depending on the rule and reviewer load. For Rule 1146/1147 boiler testing we pre-scope against the permit and keep revisions to one round.
Yes. From protocol submission and pre-test meeting through field sampling, laboratory coordination (where isokinetic recovery is required), QA/QC, and District-ready reporting. No subcontracting of the core stack work.
Crew dispatch from Stanton is typically immediate upon agreement. For urgent compliance deadlines we run expedited protocols. Pricing is a fixed-scope quote returned in 24-48 hours after a walk-through or drawings review.
Yes — 40 CFR 60 App. F, 40 CFR 75, PS-2, PS-4A, Rule 218.2/218.3. Relative Accuracy Test Audits, Cylinder Gas Audits, 7-day drift, bias tests, and Part 60/75 QA.
Most jobs run jointly with the facility’s permitting consultant or environmental manager. We share draft protocols, sampling plans, and reports in whatever workflow already exists for the site.
Rule 1146 / 1146.1 / 1146.2 (boilers), Rule 1147 (combustion), Rule 2004 & RECLAIM transition, Rule 218.2 / 218.3 (CEMS), and AB 2588 (Hot Spots). Full method list on request.

Your next source test

Tell us what needs testing. We'll scope it.

Quote back in 24-48 hours. Protocol submitted, crew on stack, defensible report delivered — same loop, 6,400 tests deep.

Live · crew available
Office
11081 Dale Ave
Stanton, CA 90680
Hours
Mon–Fri · 7am – 6pm PT
After-hours dispatch 24/7
Email
wallymoe@accuenviro.com
Typical reply < 4 hrs